Tuesday, December 23, 2008

Man Power

We called on our friend Nathan again for a little heavy lifting. In just a few minutes the electric kiln was moved from the garage (which is attached to the house) to the new kiln shed. Now both kilns will be in a separate building away from the house. Thanks Nathan!

Saturday, December 20, 2008

Aaaahhh....New England

It's been a while since my last post. I've spent most of November and the first half of December exhibiting my work and playing dress up for art openings. It's been fun to visit with lots of friends and customers that I only see once a year or so. Now it's back to work setting up the new kiln shed. Tim is connecting the electric for the little L&L kiln...so we can move that into the shed as well. My apprentice Tanner and I cleaned and moved about 5 shelving units into the new space last week. Their emptiness is like a calling...and I can't wait to start filling the shelves with pots for our first firing. It has taken an entire year to see this kiln project materialize...and when I slide that barn door away I'm still surprised to see a giant gas kiln sitting inside.

Wednesday, November 12, 2008

Fuel for the Fire

My 500 gal. propane tank came today for the kiln! Very exciting to have fuel for my fire. The gas inspector will need to come give his "okay" and we still need to finish the chimney installation before we can fire it up. OH - and make enough pots and all new glaze tests! 2009 will be an exciting year.

Tuesday, October 21, 2008

It's Electric...

Homeowners are allowed to do their own electrical work! Good times. After I stretched out 7 different 60' lengths of wires and bundled them together...we (and I mean Tim) immediately got them all tangled pulling them through the PVC. It was a free half hour marriage counseling session trying to work it all out. Tim will be doing the fussy finish work today of fitting all the PVC connectors together on the house end and getting the wires into the basement.

Another Gas company is coming today since the first company hasn't been very responsive. We (and I mean Tim) need to dig another ditch for the propane line before the ground really freezes - and that means soon!

Monday, October 13, 2008

Weekend Getaway

Tim and I have to actually leave the house in order to stop working on the kiln project - or the many other things we are trying to wrap up before winter. So - we took the opportunity to celebrate our 5 year anniversary on this fabulous fall weekend. We went up to Portsmouth NH and then back to Northfield MA and Brattleboro VT. It felt great to get away for a few days.

Back at the Hilton Compound...we have so much to finish in these next few weeks. The ditch for the electrical conduit is ready for wiring and we need to purchase different wires for underground use - and different PVC for the expanse under the driveway. The Wiring Inspector for the Town of Greenfield stopped by last week to educate me on all the things I don't know about wiring. Which is a lot. I've also been learning about Metalbestos double walled pipe for the kiln chimney where the pipe needs to pass through the roof...but I need to do a little more research on that before I buy ($$$). The shed itself is nearly done and painted - just another afternoon to finish that up.

One more ditch for Tim to dig for the coming propane line - and we want to be sure to get that done before the ground is frozen.

Meanwhile, October and November are the busiest times in my studio - getting ready for several Holiday shows and sales...so must get to glazing!

Thursday, September 25, 2008

Still at it

Tim is half way between the shed and the house with the ditch for the electric. 18" deep. The shed is half painted and mostly sided, with a door that works. Can't wait to hear back from the gas company about my hook up!

Saturday, September 13, 2008

Coming together

Made some progress today with the shed. Tim finished the roof, put up more siding, and hung the "new" old barn door we picked up at a salvage place this summer. The door will be refinished and painted - I think it will look great!

Meanwhile, the electric kiln is going non-stop while I get ready for a show on Long Island this coming weekend.