Monday, January 19, 2009

The hardest part

That's my husband on top of the snow covered roof...highly motivated to get the chimney pipe connected to the kiln. Seems 30 degree temperatures are warm in comparison to the past week - and though we had hoped to cut through the roof in late November (before the snow was a factor) we never quite made it and Tim just decided to go for it today! The sawzall died. The drill bit broke. The screws snapped in half. In general - nothing was going our way...but we managed to get the support in place and the metalbestos double-walled pipe is now supported from above - without the weight of it resting on the kiln hood. We've covered it with a tarp for the night - and will finish it up after another trip to the hardware store this week.

I whipped up a warm batch of chocolate chip cookies to show Tim my love and gratitude - and he is now thawing out and napping in front of the wood stove.

I'm so lucky.

Monday, January 5, 2009

Everyone needs a thnead

So I just finished making a dozen adorable soap dishes as I am trying to use up the last of my Laguna #310 clay which won't be going in the gas kiln. I have a few orders to start the year and will still be firing the electric kiln in order to fill those.

I'm feeling torn between needing to make 50 test pieces fast for the new kiln...and wanting to produce the highest quality work I can make. Wanting to try new things this year - more celebratory pieces like candle holders and cake stands...and needing to make lots of mistakes before I get there.

Good thing my next show will be the annual Artspace Seconds Sale in March '09.

Tuesday, December 23, 2008

Man Power

We called on our friend Nathan again for a little heavy lifting. In just a few minutes the electric kiln was moved from the garage (which is attached to the house) to the new kiln shed. Now both kilns will be in a separate building away from the house. Thanks Nathan!

Saturday, December 20, 2008

Aaaahhh....New England

It's been a while since my last post. I've spent most of November and the first half of December exhibiting my work and playing dress up for art openings. It's been fun to visit with lots of friends and customers that I only see once a year or so. Now it's back to work setting up the new kiln shed. Tim is connecting the electric for the little L&L kiln...so we can move that into the shed as well. My apprentice Tanner and I cleaned and moved about 5 shelving units into the new space last week. Their emptiness is like a calling...and I can't wait to start filling the shelves with pots for our first firing. It has taken an entire year to see this kiln project materialize...and when I slide that barn door away I'm still surprised to see a giant gas kiln sitting inside.

Wednesday, November 12, 2008

Fuel for the Fire

My 500 gal. propane tank came today for the kiln! Very exciting to have fuel for my fire. The gas inspector will need to come give his "okay" and we still need to finish the chimney installation before we can fire it up. OH - and make enough pots and all new glaze tests! 2009 will be an exciting year.

Tuesday, October 21, 2008

It's Electric...

Homeowners are allowed to do their own electrical work! Good times. After I stretched out 7 different 60' lengths of wires and bundled them together...we (and I mean Tim) immediately got them all tangled pulling them through the PVC. It was a free half hour marriage counseling session trying to work it all out. Tim will be doing the fussy finish work today of fitting all the PVC connectors together on the house end and getting the wires into the basement.

Another Gas company is coming today since the first company hasn't been very responsive. We (and I mean Tim) need to dig another ditch for the propane line before the ground really freezes - and that means soon!

Monday, October 13, 2008

Weekend Getaway

Tim and I have to actually leave the house in order to stop working on the kiln project - or the many other things we are trying to wrap up before winter. So - we took the opportunity to celebrate our 5 year anniversary on this fabulous fall weekend. We went up to Portsmouth NH and then back to Northfield MA and Brattleboro VT. It felt great to get away for a few days.

Back at the Hilton Compound...we have so much to finish in these next few weeks. The ditch for the electrical conduit is ready for wiring and we need to purchase different wires for underground use - and different PVC for the expanse under the driveway. The Wiring Inspector for the Town of Greenfield stopped by last week to educate me on all the things I don't know about wiring. Which is a lot. I've also been learning about Metalbestos double walled pipe for the kiln chimney where the pipe needs to pass through the roof...but I need to do a little more research on that before I buy ($$$). The shed itself is nearly done and painted - just another afternoon to finish that up.

One more ditch for Tim to dig for the coming propane line - and we want to be sure to get that done before the ground is frozen.

Meanwhile, October and November are the busiest times in my studio - getting ready for several Holiday shows and sales...so must get to glazing!